Reports (12,291)
-
Contractor Complaints
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Other] If Other, please specify: [Feeney Bros] Please specify details.: [Constituent states that Feeney Bros was doing work for the MBTA that ended months ago but they left a port-a-potty in front of the address which has fallen into use by unsheltered people and is a general nusance for residents of the address.]
CLOSED #101006279006Noted. Sorry for the inconvenience caused. Work will resume after the election; work was only halted due to college move-in, BPS opening, and the election from Thursday, August 28th - Tuesday, September 9th.
-
Contractor Complaints
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Other] If Other, please specify: [Pavetechs] Are the contractors on-site: [Yes] Date when this occurred: [09/08/2025] Time when this occurred: [08:55] Please specify details.: [Constituent wants to file a complaint that this contractor has their equipment piled everywhere and there cars blocking access for pedestrians. He stated that they are rude when he told them to move their cars. Their isn't a police detail as well.]
CLOSED #101006277990Noted. We understand construction can be frustrating. Currently, there’s no work on Farquhar St and Centre St, only at 1477 Centre St for the driveway. The roadway and sidewalk are clear. If you have questions about a different area, please specify and share any photos.
-
Contractor Complaints
CLOSED #101006277891Case Invalid. bad address.
-
Contractor Complaints
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [No] Please specify details.: [Constituent states after the work that was done for the last year on this road, it was not repaved correctly. Says every morning when they are driving down this street with their infant they are constantly having to swerve to avoid potholes. Lots of people are swerving and slamming on their breaks in this area because of it. Asking to please have this repaved so it is not so dangerous to drive and there is not an accident.]
CLOSED #101006273276Noted. Thank you for your understanding and patience. Newport Construction Corp is fully committed to paving this location before the end of the year. We apologize for the inconvenience caused.
-
Contractor Complaints
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [09/04/2025] Please specify details.: [Const. states construction since May has left the road ripped up and requests that this be fixed.]
CLOSED #101006273174Noted. Sorry for the inconvenience caused. Please resubmit your complaint to PWD Roadway Repair ARP Resurfacing.
-
Contractor Complaints
Type of Work: [Other] If Other, please specify: [Residential] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Please specify details.: [Constituent reports two cement trucks are blocking access to the street and sidewalk for pedestrians. Constituent reports she said something to the contractor and he was rude to her and told her he does not speak English. Constituent reports Mothers with carriages are forced to walk in the street with no detail.]
CLOSED #101006273130Noted. Could you please provide more details and resubmit your case with a specific location and a clear picture?
-
Contractor Complaints
CLOSED #101006272129Case Invalid.
-
Contractor Complaints
Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [NotSure] Date when this occurred: [09/03/2025] Please specify details.: [Constituent states there are at least 12 cones and a detour signage posted in front of the service location but there is no permitting or signage posted.]
CLOSED #101006271662Noted. Please give us information on this complaint. Thank you.
-
Contractor Complaints
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Please specify details.: [Caller states the intersection has contractors in the road diggin up the road and looks to be repaving. caller states the crews have been out there for a week and this is causing very bad traffic on metropolitan ave and HP ave.Caller states there is only one police officer directing traffic. Caller states with school starting tomorrow this is very bad timing and is requesting PW look into why this was approved.]
CLOSED #101006271598Noted. All scheduled work is shut down as of today. The only work allowed is an emergency or approved work. The Roadway will be clear for busses and parents to drop off and pick up there children at dismissal time. We will follow-up with this location. Thank you for reaching out.
-
Contractor Complaints
Name of Contractor/Utility working: [Boston Water Sewer Commission] Please specify details.: [The traffic is all back up street are blocked off BPD just standing there not helping.]
CLOSED #101006271552Noted. We apologize for the inconvenience. The contractor is removing the final equipment to clear the street for BPS first day of school. Thank you.