  • Contractor Complaints

    333 Massachusetts Ave, 1001, Boston, Ma, 02115

    Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Other] If Other, please specify: [Feeney Bros] Please specify details.: [Constituent states that Feeney Bros was doing work for the MBTA that ended months ago but they left a port-a-potty in front of the address which has fallen into use by unsheltered people and is a general nusance for residents of the address.]

    CLOSED #101006279006

    Noted. Sorry for the inconvenience caused. Work will resume after the election; work was only halted due to college move-in, BPS opening, and the election from Thursday, August 28th - Tuesday, September 9th.

  • Contractor Complaints

    Intersection Of Farquhar St And Centre St, Roslindale, Ma

    Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Other] If Other, please specify: [Pavetechs] Are the contractors on-site: [Yes] Date when this occurred: [09/08/2025] Time when this occurred: [08:55] Please specify details.: [Constituent wants to file a complaint that this contractor has their equipment piled everywhere and there cars blocking access for pedestrians. He stated that they are rude when he told them to move their cars. Their isn't a police detail as well.]

    CLOSED #101006277990

    Noted. We understand construction can be frustrating. Currently, there’s no work on Farquhar St and Centre St, only at 1477 Centre St for the driveway. The roadway and sidewalk are clear. If you have questions about a different area, please specify and share any photos.

  • Contractor Complaints

    1 A Carmen St, Dorchester, Ma, 02121

    CLOSED #101006277891

    Case Invalid. bad address.

  • Contractor Complaints

    1472 Commonwealth Ave, 1472 1, Brighton, Ma, 02135

    Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [No] Please specify details.: [Constituent states after the work that was done for the last year on this road, it was not repaved correctly. Says every morning when they are driving down this street with their infant they are constantly having to swerve to avoid potholes. Lots of people are swerving and slamming on their breaks in this area because of it. Asking to please have this repaved so it is not so dangerous to drive and there is not an accident.]

    CLOSED #101006273276

    Noted. Thank you for your understanding and patience. Newport Construction Corp is fully committed to paving this location before the end of the year. We apologize for the inconvenience caused.

  • Contractor Complaints

    Intersection Of E Cottage St And Pleasant St And Pond St, Dorchester, Ma

    Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [09/04/2025] Please specify details.: [Const. states construction since May has left the road ripped up and requests that this be fixed.]

    CLOSED #101006273174

    Noted. Sorry for the inconvenience caused. Please resubmit your complaint to PWD Roadway Repair ARP Resurfacing.

  • Contractor Complaints

    847 E Fifth St, South Boston, Ma, 02127

    Type of Work: [Other] If Other, please specify: [Residential] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Please specify details.: [Constituent reports two cement trucks are blocking access to the street and sidewalk for pedestrians. Constituent reports she said something to the contractor and he was rude to her and told her he does not speak English. Constituent reports Mothers with carriages are forced to walk in the street with no detail.]

    CLOSED #101006273130

    Noted. Could you please provide more details and resubmit your case with a specific location and a clear picture?

  • Contractor Complaints

    39 Everett St, East Boston, Ma, 02128

    CLOSED #101006272129

    Case Invalid.

  • Contractor Complaints

    49 Pratt St, Allston, Ma, 02134

    Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [NotSure] Date when this occurred: [09/03/2025] Please specify details.: [Constituent states there are at least 12 cones and a detour signage posted in front of the service location but there is no permitting or signage posted.]

    CLOSED #101006271662

    Noted. Please give us information on this complaint. Thank you.

  • Contractor Complaints

    Intersection Of Collins St And Hyde Park Ave And Metropolitan Ave, Hyde Park, Ma

    Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Please specify details.: [Caller states the intersection has contractors in the road diggin up the road and looks to be repaving. caller states the crews have been out there for a week and this is causing very bad traffic on metropolitan ave and HP ave.Caller states there is only one police officer directing traffic. Caller states with school starting tomorrow this is very bad timing and is requesting PW look into why this was approved.]

    CLOSED #101006271598

    Noted. All scheduled work is shut down as of today. The only work allowed is an emergency or approved work. The Roadway will be clear for busses and parents to drop off and pick up there children at dismissal time. We will follow-up with this location. Thank you for reaching out.

  • Contractor Complaints

    Intersection Of Myopia Rd And West St, Hyde Park, Ma

    Name of Contractor/Utility working: [Boston Water Sewer Commission] Please specify details.: [The traffic is all back up street are blocked off BPD just standing there not helping.]

    CLOSED #101006271552

    Noted. We apologize for the inconvenience. The contractor is removing the final equipment to clear the street for BPS first day of school. Thank you.