CLOSED #101006277990

Noted. We understand construction can be frustrating. Currently, there’s no work on Farquhar St and Centre St, only at 1477 Centre St for the driveway. The roadway and sidewalk are clear. If you have questions about a different area, please specify and share any photos.

Opened
Closed
Description
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Other] If Other, please specify: [Pavetechs] Are the contractors on-site: [Yes] Date when this occurred: [09/08/2025] Time when this occurred: [08:55] Please specify details.: [Constituent wants to file a complaint that this contractor has their equipment piled everywhere and there cars blocking access for pedestrians. He stated that they are rude when he told them to move their cars. Their isn't a police detail as well.]

Activity

  • Submitted

  • Opened

  • Closed