Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Other] If Other, please specify: [Feeney Bros] Please specify details.: [Constituent states that Feeney Bros was doing work for the MBTA that ended months ago but they left a port-a-potty in front of the address which has fallen into use by unsheltered people and is a general nusance for residents of the address.]
CLOSED #101006279006Noted. Sorry for the inconvenience caused. Work will resume after the election; work was only halted due to college move-in, BPS opening, and the election from Thursday, August 28th - Tuesday, September 9th.
-
Contractor Complaints
Type of Work: [Other] If Other, please specify: [Sidewalk repair and ramp reconstruction] Name of Contractor/Utility working: [Unknown] Please specify details.: [Constituent would like to know when PWD intends to repair and reconstruct the sidewalk ramps in her area. PWD was recently outside marking the sidewalk and constituent wants to act accordingly for the sitaution. Likewise, constituent has a gasline leading from her home into the ground that is taped up on sherwood st that seems like it may be damaged if the work is intense enough and they wanted to flag this issue for pwd]
OPEN #101006278918 -
Contractor Complaints
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Other] If Other, please specify: [Pavetechs] Are the contractors on-site: [Yes] Date when this occurred: [09/08/2025] Time when this occurred: [08:55] Please specify details.: [Constituent wants to file a complaint that this contractor has their equipment piled everywhere and there cars blocking access for pedestrians. He stated that they are rude when he told them to move their cars. Their isn't a police detail as well.]
CLOSED #101006277990Noted. We understand construction can be frustrating. Currently, there’s no work on Farquhar St and Centre St, only at 1477 Centre St for the driveway. The roadway and sidewalk are clear. If you have questions about a different area, please specify and share any photos.
-
Contractor Complaints
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Boston Water Sewer Commission] Are the contractors on-site: [NotSure] Date when this occurred: [09/06/2025] Time when this occurred: [23:15] Please specify details.: [They are working late hours fixing the sewers. There is lack of pedestrian access and their isn't a police detail.]
OPEN #101006277894 -
Contractor Complaints
CLOSED #101006277891Case Invalid. bad address.
-
Contractor Complaints
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [No] Date when this occurred: [09/05/2025] Please specify details.: [sidewalk work was done last week on Hazelton St. Contractors left a gap between the sidewalk and the frontage on multople lots which they filled with gravel. Won't last the winter]
OPEN #101006277811 -
Contractor Complaints
Type of Work: [Patch Repair] Name of Contractor/Utility working: [Other] Please specify details.: [PWD patched the road at entrance to the street but the asphalt came back out and now there is a big stone sticking out that nearly hurt the elderly resident at the address]
OPEN #101006276356 -
Contractor Complaints
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [National Grid] Are the contractors on-site: [No] If posted on poles, What is the TMP# on the posting: [feeney brothers] Date when this occurred: [06/15/2024] Please specify details.: [const reports over a year ago (june 2024), feeney brothers did utility work for national grid in front of this location and did a poor job repairing the sidewalk. states the previous sidewalk patch repair is now deteriorating and is in need of repair. requesting inspection and repair.]
OPEN #101006274643 -
Contractor Complaints
Type of Work: [Other] Name of Contractor/Utility working: [Other] Are the contractors on-site: [No] Please specify details.: [Rafael Hernandez Shool Parents parking for drop off and pick 8am To 9 amd pickup 2:30 3:30 .Parents park on Walnut Ave there were 10 spots and now only 3.The parents are requsting no more street occupancy permit placed up in this area.White stadium Permit parking for constuction Thank You]
OPEN #101006274364 -
Contractor Complaints
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [NotSure] Time when this occurred: [00:33] Please specify details.: [Constituent reports there is construction work at this location,constituent reports there were no signs posted no notice of any construction and now they are doing construction during very late hours.]
OPEN #101006274102