- Opened
- Description
- At 3am this morning contractors came to remove snow on Preble Street. However, this is the 2nd time that the contractors pushed a lot of the snow from the street onto my sidewalk which has taken me several hours to keep clean of snow as the City requires. The snow which was placed on my sidewalk are large frozen boulders of snow. These contractors don’t know what they are doing. Does anyone supervise their work? Please provide them instructions NOT to place snow from the road onto the sidewalks.
- Location
-
77 Preble St, South Boston, Ma, 02127
42.32913135, -71.05358993
OPEN
#101006548519
Activity
-
Submitted
Opened