- Opened
- Description
- Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [NotSure] Date when this occurred: [01/09/2026] Time when this occurred: [08:20] Please specify details.: [Constituent is reporting that the contractors dug up the street and left a square metal piece near by. She stated that the asphault is dug up on the road and you can't drive over it. Plesae fix ASAP.]
- Location
-
Intersection Of Harris St And Fairfield Pl, Boston, Ma
42.36546917, -71.05250414
OPEN
#101006441140
Activity
-
Submitted
Opened