CLOSED #101004509032

Case Noted. No immediate structural concerns. Bridge is scheduled for resurfacing and joint repairs next year.

Opened
4y ago
Closed
4y ago
Description
What is the name of the bridge: [Summer St./Fort Point Channel: (B-16-031)] What is the nature of the problem: [Constituent states the steel pieces on either side of the bridge in the roadway make a loud banging noise whenever he drives over them, is concerned that they are not stable.]
Location
Intersection Of Summer St And Melcher St, Boston, Ma
42.35047503, -71.05098939

Activity

  • Submitted

  • Opened

  • Closed