CLOSED #101003329233

Case Resolved. Emergency repairs were performed, bridge reopened to traffic 11:00 pm Friday.

Opened
Closed
Description
What is the name of the bridge: [Summer St./Fort Point Channel: (B-16-031)] What is the name of the footbridge: [Northern Ave. Bridge: (Unknown)] What is the nature of the problem: [Tractor trailer broke off and smashed into the Summer St Bridge.]
Location
245 Summer St, Boston, Ma, 02111
42.351395, -71.053852

Activity

  • Submitted

  • Opened

  • Closed